U5 Arenen Volkspark

Hamburg, Germany
2024
 

trees and cloud

OPEN SPACE
The organic design of the forecourt follows the motif of a river delta and symbolizes the flow and distribution of visitors. Guided along the lens-shaped ‘islands’, the streams of people flow southwards towards the arenas. While the first ‘islands’ are flat and accessible, they become increasingly green towards the south and the edges of the square, forming clear paths and dictating a direction of movement. At the edges, the ‘islands’ rise to form a flat topography.

TREES
The characteristic shape of the branched tree supports, which taper towards the top, reference the surrounding vegetation and embed the structure in the landscape. The architecture of the stop thus marks the northern entrance to Altonaer Volkspark and forms an attractive, identity-defining access point to the arenas.

CLOUD
The protective roof spans the station with an impressive length of 175 meters in an east-west direction and a width of 35 meters in a north-south direction, making it visible and tangible from afar in the urban landscape. The slender, subtly curved shape gives the structure a lightness that contrasts with its size. The roof floats like a cloud above the station. The scale and design language of the roof creates an exciting urban dialogue with the large structures of the arenas to the south.

SUBTLE DEFORMATION
Based on the linear, orthogonal organization of the platform level, the architecture develops vertically above street level to the roof in a gradual deformation.
The round double supports are arranged linearly on the platforms in a uniform rhythm and branch out twice in their height development, where they finally meet the curved grid of the characteristic roof shape.

SUN & RAINWATER
The core of the technical supply concept is the priority use of renewable energy. A photovoltaic system on the approximately 6,500 m² roof area generates electricity that can be used both to operate the technical systems (own power supply) and to supply individual mobility elements and, if necessary, other stations. Rainwater is retained and infiltrated via a trench cistern system in the open space. Only in the event of overload is it discharged with a delay into the receiving watercourse of the re-naturalized Mühlenau.

MATERIALITY & COLOUR
The color and material concept picks up on the overarching guidelines of the U5 design manual for the platform level and emphasizes the recognizability of the stops on the new U5 line. In terms of height, a unique design expression is formulated from street level to the roof, which emphasizes the special location and function of the Arenen event and terminus station and is reflected in a differentiated choice of materials.

SUPPORTING STRUCTURE
The supporting structure concept is based on a holistic approach that combines form-defining architecture with sustainable and economical use of materials. The roof structure is designed as a resource-saving, hybrid wood-steel construction in a semi-monocoque design. The modular, single-varietal construction has a high degree of prefabrication with reversible connections, which enable an optimized construction process and single-material separation of materials in line with the principles of the circular economy.

LIGHTING & EVENTS
The lighting in the underground station follows a holistic concept. Both during normal operation and at events, the lighting at the respective entrances can be controlled flexibly and precisely and highlighted to enable clear orientation.
The roof is staged as a central architectural element by subtle lighting of the soffit and shines in changing colour and light moods during events.

Project Data

Program: New construction of the event-underground station U5 Arenen

Place: Hamburg

Client: Hamburger Hochbahn AG

Team:
Architecture:  LIN  ARCHITECTURE + URBANISM, Berlin
Finn Geipel, John Klepel, Félix Korganow, Amir Sheykhan, Hans Jakob Walter, Antonio Verni, Arita Dreshaj, Daria Alekseeva, Hannes Jasper Marten Müller
Landscape: UNIOLA, München
Structure:  Bollinger+Grohmann, Hamburg
Lighting design:  LICHT KUNST LICHT AG, Berlin
Tech. building equipment:  ITGT, Kiel
Fire protection:  HHP, Berlin
Cost planning:  Höhler+Partner, Hamburg
Visualisation:  bloomimages, Hamburg

trees and cloud
Image 1/17
Image 2/17
Image 3/17
Image 4/17
Image 5/17
Image 6/17
Image 7/17
Image 8/17
Image 9/17
Image 10/17
Image 11/17
Image 12/17
Image 13/17
Image 14/17
Image 15/17
Image 16/17
Image 17/17
bild
bild
 
 
Category Ref. Title Year City Country Type Status
Architecture MVS Montrouge Verdun Sud Montrouge Verdun Sud 2023 Montrouge France Housing Realized + 86
Architecture, Urbanism FUW Quartier Fürstenried West Quartier Fürstenried West 2025 Munich Germany Mixed-Use Competition 1st prize, ongoing + 135
Architecture BGW Bremer Punkt 1-10 Vielfalt in Serie Bremer Punkt 1-10 Vielfalt in Serie 2022 Bremen Germany Housing Realized + 2402
Architecture SCD Cité du Design Cité du Design 2009 Saint-Étienne France Cultural Realized + 2338
Architecture N6N Halle 6 ouest Halle 6 ouest 2019 Nantes France Cultural Realized + 1645
Architecture PAQ Housing Building, Quai Henri IV Housing Building, Quai Henri IV 2015 Paris France Housing Realized + 1991
Urbanism PAM Grand Paris Métropole Douce Grand Paris Métropole Douce 2008 Paris France Urban Design Study Completed + 1545
Architecture BT2 Typenhochhaus Typenhochhaus 2017 Berlin Germany Housing Competition 1st Prize + 1330
Architecture PRC Paris, Caserne de Reuilly Paris, Caserne de Reuilly 2019 Paris France Housing Realized + 1533
Architecture SNA Alvéole 14 Alvéole 14 2007 Saint- Nazaire France Cultural Realized + 1714
Architecture BPJ Boulogne Point-du-Jour Boulogne Point-du-Jour 2019 Paris France Housing Realized + 180
Design PAR Permanent Exhibition Space Permanent Exhibition Space 2003 Paris France Exhibition Realized + 1309
Architecture TAC Achillion Coastal Platform Achillion Coastal Platform 1997 Thessaloniki Greece Infrastructure Competition + 1331
Architecture NAC Nîmes Arena Nîmes Arena 1989 Nîmes France Cultural Realized + 1805
Architecture AMF Métafort Multimedia Research Center Métafort Multimedia Research Center 1998 Aubervillers France Cultural Competition + 1514
Architecture LEC National School of Art National School of Art 1994 Limoges France Education Realized + 1463
Architecture OKH Oldenburg House Oldenburg House 2003 Oldenburg Germany Housing Realized + 1414
Urbanism ZAA Atlas Actif des Vallées Stéphanoises Atlas Actif des Vallées Stéphanoises 2008 Saint-Étienne France Research Study Completed + 1414
Art BSY Syn Chron Syn Chron 2005 Berlin Germany Exhibition Realized + 1394
Architecture POL Office Building in Paris Office Building in Paris 2012 Paris France Office Realized + 1427
Urbanism KSB Strasbourg - Kehl, Cour des Douanes - Zollhofareal Strasbourg - Kehl, Cour des Douanes - Zollhofareal 2013 Strasbourg/Kehl France/Germany Urban Design Competition 1st Prize + 1358
Architecture BIN LIN Office Space LIN Office Space 2012 Berlin Germany Office Realized + 1636
Urbanism AMP Aix-en-Provence Marseille Aix-en-Provence Marseille 2015 Aix-Marseille-Provence France Urban Design Study Completed + 1192
Design D+-0 Density ±0 Density ±0 2004 Paris France Exhibition Realized + 1444
Urbanism STA Urban Study for the Development of Sevran Urban Study for the Development of Sevran 2015 Sevran France Urban Design Study Completed + 1381
Architecture HA5 U5 Arenen Volkspark U5 Arenen Volkspark 2024 Hamburg Germany Infrastructure Competition 3rd prize + 2