Kleyer House

Oldenburg, GER
2003
 

Enclosure

In a residential area in the town of Oldenburg, situated among houses built and designed in the typical North German style, this minimal steel box catches the eye. In order to meet the client's demands for ample space on a tight budget, an inexpensive, prefabricated steel system is chosen, to be constructed at a cost of 1,500€ m², creating a house for a family of four that at first look resembles an industrial shed, and inside holds a block containing the standard domestic facilities.
The house is clad with vertical trapezoidal-profile sheeting and stands on a concrete ground slab that extends 1.5 m beyond the walls on all four sides.
The steel portal frame made from standard rolled sections spans the full 9 m width of the building. Lightweight concrete infill panels provide the necessary stability for the 22 m long structure.

Organization

On the west side, the living and dining areas occupy the full length and height of the building, with continuous glazing enabling the interior to be opened up into the garden. The single-story block on the east side contains the kitchen, bathrooms and three small bedrooms in timber studding clad in wood-based panelling and plasterboard.

Spatial volume

The prefabricated steel frame hall structure on the east side contains a single story built-in unit whose ceiling, for the most part, constitutes an open gallery story. The industrial structure remains unhidden, allowing the eye to roam the mildly sloping roof girders and undersides of the trapezoidal sheeting.

Structure

The main entrance, a plain, slim door on the otherwise fully closed northern gable end, features a double-leaf counterpart on the south side of the house. Along the westward longitudinal wall, a strip of continuous 2 meter-high windows with a dense pattern of mullions provides glare-free lighting into the ground floor, while the façade above is left fully devoid of openings.

Program

The inner organization of the house works like a simple hall. On the westside, a living and dining area covers the full length of 22 meters, maximising a feeling of openness. The east side houses a wooden box with three bedrooms, bathrooms and a kitchen. An elevated platform separating the two spaces additionally functions as a storage space, while distinguishing the two spaces based on their private and public functions.

Function

Beneath the single-story block on the east side containing domestic areas like the kitchen, bathrooms and bedrooms, an access floor accommodates all the horizontal services, preventing the need to bury pipes and cables in the concrete slab ground. A step running the full length of the building serves as a "corridor zone" linking the rooms on the east side and the open area on the west side, while also containing drawers for storage purposes. The gallery on the upper level, accessible via a sliding steel ladder, is used for activities like reading and working. That might require quiet withdrawal.

Surface

Considering the alternating closed and glazed surfaces, the views around this two story residential building offer distinct indications of how the various functions of the home are distributed. Generous glazing throughout allows for garden views and plenty of daylight inside the house.
The impression of spatial generosity persists, as from almost any position within the house one keeps all other areas in view.

Temporality

Amongst its other traditional counterparts, the house, with its concrete slab base and steel portal frame, gives a feeling of temporality but rooted in context. It stands in the garden like a striking piece of contemporary furniture on a plush carpet.

Project Data

Program

The demand was to establish a maximum of open space and at the same time several specific rooms with a small budget. The solution is a large monospace with a built in box containing minimal dimensioned functional and individual rooms.

Client: private

Status: Completed

Location: Oldenburg, Germany

Cost: 200,000 €

Surface: 230 m²

Award: Weser-Ems-Preis für Architektur und Ingenieurbau 2005

 

Team

Architects: LIN Architects Urbanists, Finn Geipel, Giulia Andi with Ahnert, Andre Schmidt, Berlin;  Local Architect: Wilken, Wedemeyer & Partner, Oldenburg; Structural Engineer: Christian Focken, Bad Zwischenahn; Photography: Werner Huthmacher

Enclosure
 OKH-01-ESS-LIN-external view, photo: Werner Huthmacher
Image 1/8 OKH-01-ESS-LIN-external view, photo: Werner Huthmacher
Organization
OKH-02-ESS-LIN-Sketch
Image 2/8 OKH-02-ESS-LIN-Sketch
Spatial volume
OKH-03-LIN-ESS-internal view, photo: Werner Huthmacher
Image 3/8 OKH-03-LIN-ESS-internal view, photo: Werner Huthmacher
Structure
OKH-04-ESS-LIN-side view, photo: Werner Huthmacher
Image 4/8 OKH-04-ESS-LIN-side view, photo: Werner Huthmacher
Program
 OKH-05-ESS-LIN-floor plan
Image 5/8 OKH-05-ESS-LIN-floor plan
Function
OKH-06-ESS-LIN-cross section
Image 6/8 OKH-06-ESS-LIN-cross section
Surface
OKH-07-ESS-LIN-openings and views, photo: Werner Huthmacher
Image 7/8 OKH-07-ESS-LIN-openings and views, photo: Werner Huthmacher
Temporality
OKH-08-ESS-LIN-view from the garden, photo: Werner Huthmacher
Image 8/8 OKH-08-ESS-LIN-view from the garden, photo: Werner Huthmacher
bild
bild
 
 
Category Ref. Title Year City Country Type Status
Architecture MVS Housing above Metro Station Housing above Metro Station 2023 Montrouge FR ARCH Realisation + 122
Architecture, Urbanism FUW Quarter Development Fürstenried West Quarter Development Fürstenried West 2026 Munich GER URB + ARCH Realisation + 203
Architecture BGW Serial Housing Project Bremer Punkt Serial Housing Project Bremer Punkt 2022 Bremen GER ARCH Realisation + 2442
Architecture SCD Cité du Design Cité du Design 2009 Saint-Étienne FRA ARCH Realisation + 2388
Architecture F-Q1 Fürstenried West, Haus Brisi Fürstenried West, Haus Brisi 2025 Munich GER ARCH Realisation + 45
Urbanism PGM Urban Development Gare des Mines - Filettes Urban Development Gare des Mines - Filettes 2026 Paris FRA URB Study + 1
Architecture N6N Halle 6 Ouest Digital Hub Halle 6 Ouest Digital Hub 2019 Nantes FR ARCH Realisation + 1673
Architecture PAQ Housing, Quai Henri IV Housing, Quai Henri IV 2016 Paris FRA ARCH Realisation + 2002
Territory PAM Grand Paris Métropole Douce Grand Paris Métropole Douce 2016 Paris FRA TER Study + 1554
Architecture BT2 Case Study High-Rise Building Case Study High-Rise Building 2017 Berlin GER ARCH Competition + 1344
Architecture PRC Caserne de Reuilly Caserne de Reuilly 2019 Paris FRA ARCH Realisation + 1580
Architecture SNA Submarine Bunker Alvéole 14 Submarine Bunker Alvéole 14 2007 Saint- Nazaire FRA ARCH Realisation + 1739
Architecture BPJ Housing Point-du-Jour Housing Point-du-Jour 2019 Paris Boulogne FRA ARCH Realisation + 187
Architecture PAR Exhibition Space, Pavillon de l’Arsenal Exhibition Space, Pavillon de l’Arsenal 2003 Paris FRA ARCH Realisation + 1312
Architecture TAC Achillion Coastal Platform Achillion Coastal Platform 1997 Thessaloniki GRC ARCH Study + 1334
Architecture NAC Temporary Covering of the Nimes Arena Temporary Covering of the Nimes Arena 2000 Nîmes FRA ARCH Realisation + 1816
Architecture AMF Métafort Multimedia Research Center Métafort Multimedia Research Center 1998 Aubervillers FRA ARCH Competition + 1515
Architecture LEC Ecole Nationale Supérieure d'Art et de Design Ecole Nationale Supérieure d'Art et de Design 1994 Limoges FR ARCH Realisation + 1467
Architecture OKH Kleyer House Kleyer House 2003 Oldenburg GER ARCH Realisation + 1421
Urbanism ZAA Atlas Actif Atlas Actif 2008 Saint-Étienne FRA URB Realisation + 1416
Experimental BSY Syn chron, Neue Nationalgalerie Syn chron, Neue Nationalgalerie 2005 Berlin GER EXP Realisation + 1395
Architecture POL Office Building Pajol Office Building Pajol 2012 Paris FRA ARCH Realisation + 1429
Territory KSB Cour des Douanes / Zollhofareal Cour des Douanes / Zollhofareal 2013 Strasbourg, Kehl FRA, GER TER Study + 1359
Territory AMP Métropole d’Aix-Marseille-Provence Métropole d’Aix-Marseille-Provence 2019 Aix, Marseille FRA TER Study + 1193
Architecture D+-0 Ecole Nationale Supérieure des Beaux-Arts Ecole Nationale Supérieure des Beaux-Arts 2004 Paris FRA ARCH Experimental + 1444
Urbanism STA Urban Development Sevran Terre d'Avenir Urban Development Sevran Terre d'Avenir 2016 Sevran FRA URB Study + 1387
Architecture PRG Housing Complex Rive Gauche Housing Complex Rive Gauche 2026 Paris FRA ARCH Realisation + 3
Architecture HA5 U5 Arenen Volkspark U5 Arenen Volkspark 2024 Hamburg GER ARCH Competition + 9
Architecture, Urbanism HWH Residential Complex Hafenbahnpark Residential Complex Hafenbahnpark 2026 Hamburg GER URB + ARCH Realisation + 0
Architecture, Urbanism REY Residential Complex du Haut-Sancé Residential Complex du Haut-Sancé 2026 Rennes FRA URB + ARCH Realisation + 0
Architecture BTM Urban Tech Republic TXL Mobility Hubs Urban Tech Republic TXL Mobility Hubs 2026 Berlin GER ARCH Competition + 0