Temporary Covering of the Nimes Arena

Nîmes, FRA
2000
 

Roman Arena

In December 1988 the ancient arena of Nîmes is for the first time covered with temporary roofing – a lens-shaped pneumatic form commissioned for winter-season use. Meant to be assembled and dismantled twice a year, the lightweight structure keeps careful distance between the ancient walls and the new roofing. The discreet solution, characterized by its very low section, from the exterior hardly renders visible the fact that within the old Roman walls something has changed. Inside the arena, the shape of the new roof does not limit the natural upward lift of the ancient elliptical theatre seating. The pneumatic construction is an integrated contemporary solution, technically compatible with the monument.

Catalyst for a mixed city

The structure impressively symbolizes the idea of a European city, honoring histories while providing new opportunities for a contemporary and future public via integrative design and innovative technologies. The amphitheatre of Nîmes demonstrates a principle of entanglement with the urban fabric – simultaneously concentrated and connected – thus embodying a contemporary model of the mixed city.

Form

Running counter to an assimilative language, the autonomous and independent element within the ancient arena’s cavea refrains from interacting, keeping a significant distance from the structure; the result: a lenticular pneumatic form, floating freely above the elliptical area of the arena, the lower convex lens enclosing not like a lid, but somehow retaining a lightness, open to the sky.

Lens

The roof consists of two translucent polyester tarpaulins of 4,200 m² that create an air cushion 13 m high.
Both membranes covering the arena are made of a PVC-coated polyester fabric; the lower membrane rests on a network of cables to reduce its interior curvature.

Plan

The structure itself consists of an elliptical steel compression ring with hinged cushioned membranes. This highly flexible compression ring is bowed and stabilized simultaneously. The self-stabilizing steel ring, similar to a wheel hub, rests on 30 supporting metallic columns

Permeability

The roof and the steps are connected by a transparent and adjustable cimbia composed of polycarbonate sheets mounted on aluminium supports, allowing the public inside to fully appreciate the monument. The cimbia was carefully researched down to the last detail as regards to shape, curvature, assembly and storage. The hollow box girders have a wingspan of 6.35 meters, with a height of 150 mm and a width of 450 mm. The principle was based on slat prototypes developed by Merlo, a Turin company specializing in sun protection systems.

Assembly

Cyclical use and economic demands require the weight and dimensions of all components to be intensely calibrated, taking into consideration potential expansion and shifting of materials as a result of climate and regular handling.

Components

All components are designed and factory-manufactured to the nearest millimeter before being assembled on site, without the possibility of an on-site adjustment.
These requirements help further our approach in seeing architecture not purely as an explicitly formal activity, but as a system of complex interactions between dynamic states and singular parts.

Weightlessness

Despite the roof’s "weightlessness", a powerful shape persists, completely lacking in nostalgic elements, an air cushion confronting the monolithic stone. This architecture is not a frontal attack against established patterns and ruins but develops out of 'practical knowledge' which makes a critical contribution towards the enduring life of this historical monument. A crowded urban vista is met by the weightlessness of an interior intervention enabling the ancient facility a modern day use.

Interior

The new roof guarantees maximum illumination for the auditorium, offers both technical and acoustic insulation for the complex, and provides air circulation via the rotating sheets of the inclined cimbia façade.

Temporality

A winter flight over Nîmes reveals a glowing lens exposed and hovering above the amphitheatre. However, while the stone skeleton of the arena rests hulking and immobile, the NAC shelter is temporary and reversible. Besides the mounting apparatus, in the summer months no element of the 6,000 m2 construction remains. Contrary to its first impression this massive structure is not final and immutable, but carries within itself the principle of its cyclical addition and removal.

Project Data

Program

Installation of a mobile and temporary roofing to create a winter show space in the antique arena (1st century AD). The inflatable membrane lens (91m x 62m) is held in a compression ring on 30 metallic columns. The periphery is closed by a system of transparent and revolving coverslips.

Client: City of Nîmes

Status: since December 1989 yearly erection

Location: Nîmes, Gard, France Arènes antiques, Place de la République

Cost: 6.50 Mio€ (value 1989)

Surface: 8,000 m², Inflatable Lense measures: 91m x 62m

 

Team

Architects: LABFAC, Finn Geipel, Nicolas Michelin; Structural Engineers: Werner Sobek; Schlaich, Bergermann and Partner, Stuttgart; Acoustic Engineers: Roger Lamoral, Cannes; Civil Engineers:  Guy Bonardi, Paris; Construction Firm: Baudin Châteauneuf, Orléans; Façade Engineers: Merlo, Turin; Engineers for the membrane: Stromeyer Ingenieurbau, Konstanz; Sound: Christian Heil, Gonnesse; Execution: Baudin Châteauneuf, Orléans; Electric Engineer: Bet Bleuse; Photography: George Fessy

Roman Arena
NAC-01-LIN-ESS-Internal view of the Nîmes arena, photo: George Fessy
Image 1/11 NAC-01-LIN-ESS-Internal view of the Nîmes arena, photo: George Fessy
Catalyst for a mixed city
NAC-02-ESS-LIN-Urban Structure around the Nîmes arena
Image 2/11 NAC-02-ESS-LIN-Urban Structure around the Nîmes arena
Form
NAC-03-ESS-LIN-Cross section of the Nîmes arena and Construction of the lens for the roof
Image 3/11 NAC-03-ESS-LIN-Cross section of the Nîmes arena and Construction of the lens for the roof
Lens
 NAC-04-ESS-LIN-internal lens view, photo: George Fessy
Image 4/11 NAC-04-ESS-LIN-internal lens view, photo: George Fessy
Plan
NAC-05-ESS-LIN-floor plan
Image 5/11 NAC-05-ESS-LIN-floor plan
Permeability
 NAC-06-ESS-transparency through the structure, photo: George Fessy
Image 6/11 NAC-06-ESS-transparency through the structure, photo: George Fessy
Assembly
NAC-07-ESS-LIN-Installation of the canopy over the arena, photo: George Fessy
Image 7/11 NAC-07-ESS-LIN-Installation of the canopy over the arena, photo: George Fessy
Components
NAC-08-ESS-LIN-Detail  of the connecting plate, photo: George Fessy
Image 8/11 NAC-08-ESS-LIN-Detail of the connecting plate, photo: George Fessy
Weightlessness
 NAC-09-ESS-LIN-Process of inflation of the pneumatic membrane, photo: George Fessy
Image 9/11 NAC-09-ESS-LIN-Process of inflation of the pneumatic membrane, photo: George Fessy
Interior
 NAC-10-ESS-LIN-Internal view after installation, photo: George Fessy
Image 10/11 NAC-10-ESS-LIN-Internal view after installation, photo: George Fessy
Temporality
 NAC-11-ESS-LIN-New roof amidst the surroundings, photo: George Fessy
Image 11/11 NAC-11-ESS-LIN-New roof amidst the surroundings, photo: George Fessy
bild
bild
 
 
Category Ref. Title Year City Country Type Status
Architecture MVS Housing above Metro Station Housing above Metro Station 2023 Montrouge FR ARCH Realisation + 122
Architecture, Urbanism FUW Quarter Development Fürstenried West Quarter Development Fürstenried West 2026 Munich GER URB + ARCH Realisation + 203
Architecture BGW Serial Housing Project Bremer Punkt Serial Housing Project Bremer Punkt 2022 Bremen GER ARCH Realisation + 2442
Architecture SCD Cité du Design Cité du Design 2009 Saint-Étienne FRA ARCH Realisation + 2388
Architecture F-Q1 Fürstenried West, Haus Brisi Fürstenried West, Haus Brisi 2025 Munich GER ARCH Realisation + 45
Urbanism PGM Urban Development Gare des Mines - Filettes Urban Development Gare des Mines - Filettes 2026 Paris FRA URB Study + 1
Architecture N6N Halle 6 Ouest Digital Hub Halle 6 Ouest Digital Hub 2019 Nantes FR ARCH Realisation + 1673
Architecture PAQ Housing, Quai Henri IV Housing, Quai Henri IV 2016 Paris FRA ARCH Realisation + 2002
Territory PAM Grand Paris Métropole Douce Grand Paris Métropole Douce 2016 Paris FRA TER Study + 1554
Architecture BT2 Case Study High-Rise Building Case Study High-Rise Building 2017 Berlin GER ARCH Competition + 1344
Architecture PRC Caserne de Reuilly Caserne de Reuilly 2019 Paris FRA ARCH Realisation + 1580
Architecture SNA Submarine Bunker Alvéole 14 Submarine Bunker Alvéole 14 2007 Saint- Nazaire FRA ARCH Realisation + 1739
Architecture BPJ Housing Point-du-Jour Housing Point-du-Jour 2019 Paris Boulogne FRA ARCH Realisation + 187
Architecture PAR Exhibition Space, Pavillon de l’Arsenal Exhibition Space, Pavillon de l’Arsenal 2003 Paris FRA ARCH Realisation + 1312
Architecture TAC Achillion Coastal Platform Achillion Coastal Platform 1997 Thessaloniki GRC ARCH Study + 1334
Architecture NAC Temporary Covering of the Nimes Arena Temporary Covering of the Nimes Arena 2000 Nîmes FRA ARCH Realisation + 1816
Architecture AMF Métafort Multimedia Research Center Métafort Multimedia Research Center 1998 Aubervillers FRA ARCH Competition + 1515
Architecture LEC Ecole Nationale Supérieure d'Art et de Design Ecole Nationale Supérieure d'Art et de Design 1994 Limoges FR ARCH Realisation + 1467
Architecture OKH Kleyer House Kleyer House 2003 Oldenburg GER ARCH Realisation + 1421
Urbanism ZAA Atlas Actif Atlas Actif 2008 Saint-Étienne FRA URB Realisation + 1416
Experimental BSY Syn chron, Neue Nationalgalerie Syn chron, Neue Nationalgalerie 2005 Berlin GER EXP Realisation + 1395
Architecture POL Office Building Pajol Office Building Pajol 2012 Paris FRA ARCH Realisation + 1429
Territory KSB Cour des Douanes / Zollhofareal Cour des Douanes / Zollhofareal 2013 Strasbourg, Kehl FRA, GER TER Study + 1359
Territory AMP Métropole d’Aix-Marseille-Provence Métropole d’Aix-Marseille-Provence 2019 Aix, Marseille FRA TER Study + 1193
Architecture D+-0 Ecole Nationale Supérieure des Beaux-Arts Ecole Nationale Supérieure des Beaux-Arts 2004 Paris FRA ARCH Experimental + 1444
Urbanism STA Urban Development Sevran Terre d'Avenir Urban Development Sevran Terre d'Avenir 2016 Sevran FRA URB Study + 1387
Architecture PRG Housing Complex Rive Gauche Housing Complex Rive Gauche 2026 Paris FRA ARCH Realisation + 3
Architecture HA5 U5 Arenen Volkspark U5 Arenen Volkspark 2024 Hamburg GER ARCH Competition + 9
Architecture, Urbanism HWH Residential Complex Hafenbahnpark Residential Complex Hafenbahnpark 2026 Hamburg GER URB + ARCH Realisation + 0
Architecture, Urbanism REY Residential Complex du Haut-Sancé Residential Complex du Haut-Sancé 2026 Rennes FRA URB + ARCH Realisation + 0
Architecture BTM Urban Tech Republic TXL Mobility Hubs Urban Tech Republic TXL Mobility Hubs 2026 Berlin GER ARCH Competition + 0