Case Study High-Rise Building

Berlin, GER
2017
 

Neuer Berliner Typus

The "Typenhochhaus" is designed as a modular building system, providing many possibilities for adaptation based on different urban situations. Flexible floor plans allow for different sizes of apartments and individual configurations, catering to the needs of a heterogeneous mix of inhabitants. In addition, building height, number of apartments, additional programmes and façade can be adapted according to the site and context.

Functions of the building are organised concentrically. The central core enables highly-efficient and flexible apartment types, which can be organised into 6-10 units per floor. Continuous balconies along the façade offer generous private outdoor areas. A uniform, modular façade system, column-free space and a clear layout of installation shafts around the central core maximize the building´s flexibility in configurations, divisions and combinations of the apartments, which can be reorganized and modified into working spaces and offices.

The modular construction system allows easy construction of double-storey spaces for different social programmes such as guest apartments and co-working spaces. The roof terrace enhances social interaction as well. In addition to the spacious, double-height entrance lobby and bicycle parking, the plinth zone can accommodate a kindergarten, E-bike facilities, a bicycle workshop and a café.

Each façade consists of layers that are designed to react to different conditions, such as wind or noise based on its orientation. Uniform openings, continuous balconies, balustrades, noise and wind protection panels are held together by a structural grid in the façade. As a result, these layers intertwine and build a complex threshold between indoor and outdoor spaces. The building maintains a constant dialogue with its surrounding – individual façades and characters are developed based on specific urban conditions and needs of the inhabitants in each building.

Differentiation in color and material in each building serves as a guiding system that gives a distinctive identity to each location. Not only confined to the ground floor, common spaces can also be found throughout the building vertically and are further accentuated by color.

The modular building system consists mostly of prefabricated construction elements. It allows the building to be constructed in a short period of time with minimal interventions on the construction site. The load-bearing structure designed as a concrete frame construction with highly-insulated timber frames meets many passive housing standards.

Project Data

Program: Typen-Wohnhochhaus
                125 Apartments, Kindergarten, bicycle workshop, café/bar.
                Community use: Guest apartments, coworking space, roof terrace.

 

Project status: Competition: 1st prize, March 2017

 

Place: Exemplary site, Berlin

 

Client: HOWOGE Wohnungsbaugesellschaft mbH
           Ferdinand-Schultze-Straße 71
           13055 Berlin

 

Team:
Design planning:
Architecture: LIN Architects Urbanists, Berlin/Paris: Finn Geipel, Giulia Andi

John Klepel (Project manager)

Carolin Miller, Maja Lesnik, Vesta Nele Zareh, Philip König, Samy Frank,
Marie Thelen, Piera Cardea, Kim Tzarowsky, Binta von Rönn

Solid structure: Bollinger + Grohmann, Berlin

Timber structure: PIRMIN JUNG Ingenieure für Holzbau, Deutschland GmbH, Sinzig

Tech. building equipment: Winter Ingenieure, Berlin

Fire protection: brandkontrolle Andreas Flock, Berlin

Landscape design: Lavaland/Treibhaus, Berlin

Cost calculation: Höhler+Partner, Hamburg

Climate engineering: Transsolar, Stuttgart

Visualisation: Ponnie Images, Aachen

 

Surface: 8,400 m²

 

Dates: Competition: December 2016 - February 2017

Neuer Berliner Typus
Neuer Berliner Typus
Image 1/13 Neuer Berliner Typus
Neuer Berliner Typus
Image 2/13 Neuer Berliner Typus
Layers and Levels
Image 3/13 Layers and Levels
Floor Plan Kit
Image 4/13 Floor Plan Kit
Spatial Quality
Image 5/13 Spatial Quality
Modular Building System
Image 6/13 Modular Building System
Groundfloor Plan
Image 7/13 Groundfloor Plan
Colour and Material Concept
Image 8/13 Colour and Material Concept
Colour and Material Concept
Image 9/13 Colour and Material Concept
Sunlight Exposure and Wind Impact
Image 10/13 Sunlight Exposure and Wind Impact
Façade
Image 11/13 Façade
Modular Building System
Image 12/13 Modular Building System
Model
Image 13/13 Model
bild
bild
 
 
Category Ref. Title Year City Country Type Status
Architecture MVS Housing above Metro Station Housing above Metro Station 2023 Montrouge FR ARCH Realisation + 122
Architecture, Urbanism FUW Quarter Development Fürstenried West Quarter Development Fürstenried West 2026 Munich GER URB + ARCH Realisation + 203
Architecture BGW Serial Housing Project Bremer Punkt Serial Housing Project Bremer Punkt 2022 Bremen GER ARCH Realisation + 2442
Architecture SCD Cité du Design Cité du Design 2009 Saint-Étienne FRA ARCH Realisation + 2388
Architecture F-Q1 Fürstenried West, Haus Brisi Fürstenried West, Haus Brisi 2025 Munich GER ARCH Realisation + 45
Urbanism PGM Urban Development Gare des Mines - Filettes Urban Development Gare des Mines - Filettes 2026 Paris FRA URB Study + 1
Architecture N6N Halle 6 Ouest Digital Hub Halle 6 Ouest Digital Hub 2019 Nantes FR ARCH Realisation + 1673
Architecture PAQ Housing, Quai Henri IV Housing, Quai Henri IV 2016 Paris FRA ARCH Realisation + 2002
Territory PAM Grand Paris Métropole Douce Grand Paris Métropole Douce 2016 Paris FRA TER Study + 1554
Architecture BT2 Case Study High-Rise Building Case Study High-Rise Building 2017 Berlin GER ARCH Competition + 1344
Architecture PRC Caserne de Reuilly Caserne de Reuilly 2019 Paris FRA ARCH Realisation + 1580
Architecture SNA Submarine Bunker Alvéole 14 Submarine Bunker Alvéole 14 2007 Saint- Nazaire FRA ARCH Realisation + 1739
Architecture BPJ Housing Point-du-Jour Housing Point-du-Jour 2019 Paris Boulogne FRA ARCH Realisation + 187
Architecture PAR Exhibition Space, Pavillon de l’Arsenal Exhibition Space, Pavillon de l’Arsenal 2003 Paris FRA ARCH Realisation + 1312
Architecture TAC Achillion Coastal Platform Achillion Coastal Platform 1997 Thessaloniki GRC ARCH Study + 1334
Architecture NAC Temporary Covering of the Nimes Arena Temporary Covering of the Nimes Arena 2000 Nîmes FRA ARCH Realisation + 1816
Architecture AMF Métafort Multimedia Research Center Métafort Multimedia Research Center 1998 Aubervillers FRA ARCH Competition + 1515
Architecture LEC Ecole Nationale Supérieure d'Art et de Design Ecole Nationale Supérieure d'Art et de Design 1994 Limoges FR ARCH Realisation + 1467
Architecture OKH Kleyer House Kleyer House 2003 Oldenburg GER ARCH Realisation + 1421
Urbanism ZAA Atlas Actif Atlas Actif 2008 Saint-Étienne FRA URB Realisation + 1416
Experimental BSY Syn chron, Neue Nationalgalerie Syn chron, Neue Nationalgalerie 2005 Berlin GER EXP Realisation + 1395
Architecture POL Office Building Pajol Office Building Pajol 2012 Paris FRA ARCH Realisation + 1429
Territory KSB Cour des Douanes / Zollhofareal Cour des Douanes / Zollhofareal 2013 Strasbourg, Kehl FRA, GER TER Study + 1359
Territory AMP Métropole d’Aix-Marseille-Provence Métropole d’Aix-Marseille-Provence 2019 Aix, Marseille FRA TER Study + 1193
Architecture D+-0 Ecole Nationale Supérieure des Beaux-Arts Ecole Nationale Supérieure des Beaux-Arts 2004 Paris FRA ARCH Experimental + 1444
Urbanism STA Urban Development Sevran Terre d'Avenir Urban Development Sevran Terre d'Avenir 2016 Sevran FRA URB Study + 1387
Architecture PRG Housing Complex Rive Gauche Housing Complex Rive Gauche 2026 Paris FRA ARCH Realisation + 3
Architecture HA5 U5 Arenen Volkspark U5 Arenen Volkspark 2024 Hamburg GER ARCH Competition + 9
Architecture, Urbanism HWH Residential Complex Hafenbahnpark Residential Complex Hafenbahnpark 2026 Hamburg GER URB + ARCH Realisation + 0
Architecture, Urbanism REY Residential Complex du Haut-Sancé Residential Complex du Haut-Sancé 2026 Rennes FRA URB + ARCH Realisation + 0
Architecture BTM Urban Tech Republic TXL Mobility Hubs Urban Tech Republic TXL Mobility Hubs 2026 Berlin GER ARCH Competition + 0